Site icon SGBI

Customer Requirements Gathering

Customer Requirement Gathering

This is a data driven approach to propose the best suited solution for your need.

Please scroll down

Customer Requirements Gathering
Your Industry Verticals

General Information

Are you new to testing automation?
What are you looking for?
Which package would you like to opt for as the ideal solution?
Do you need extended support to integrate the system into your test environment?
Purpose of HMI Test Automation?
Where are you planning to implement this solution?
How are you testing your HMI now?

About DUT(Device Under Test)

What type of interface do we need to test?
Please provide an approximate size of the device under test (Foot Print:Length, Width & Height) in mm
Normally size of the touch screen or region you want the robot need to touch & operate (x,y and z axis) in mm
Do you have mounting capabilities to fix the DUT in a fixed place?
What will be the orientation of the DUT interface?
Would you require an internal power supply to power the DUT for the uninterrupted long testing cycle?

About Touch Screen & Testing Elements

What kind of interface needs to be tested?
What is the touch technology used?
What are the types of interface elements that needs to be tested?

Type of Testing

What are the types of operations that need to be performed using the robot?
What are your KPI's with Haptic testing?
Do you need to evaluate the content on the screen?
Do you need OCR(Optical Character Recognisition) in test result evaluation?
Do you need to change the type of test probes for the uninterrupted test process(auto tooling/automatic finger change)?
Do you need to remember the characteristics of DUT for future usage? (DUT persona memory to avoid repeat setup time loss)
What are the types of tests that need to be perform?
Do you need to use a vision system to close the loop or verify the testing process?
If you need a vision system what camera you will prefer?
Which is your preferred communication interface to the robot?
What is the average length of your test cases?
How frequently do you need to change the DUT during the testing process?
The environment in which the robot is supposed to be used?
What kind of safety measures do you need in the device?
Calibrated parameters required in the robot?
What kind of test rig would you require?
Who will be the end-user of the robot?
Targeted number of the unit requirement? (Immediate purchase)
Targeted number of the unit requirement? (In the coming 3-5 year)

Exit mobile version